Another landmark in the history of New Orleans' relationship with the US Army Corps of Engineers was reached today, according to Mark Schleifstein in the TImes-Picayune. The new gates and levee repairs by the Corps, which the agency announced with great fanfare had given between 4 and 5 feet of additional flood protection to the Lakeview and Old Metairie neighborhoods, both inundated when the floodwalls breached after Katrina, are, it now appears, giving almost no additional protection. The problem: a minus sign that should have been a plus sign. And still the Congress refuses to mandate independent peer review for the Corps' work in engineering and building structures upon which millions of people depend for their safety.
Monday, November 19, 2007
Subscribe to:
Posts (Atom)